19
Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17
Planning the installation
Circuit diagram for 1-phase grids
N’
L’
N
L
BT
CAN
DC2
DC1
PE
D
ATA
GND
VCC
D
ATA
D
ATA
D
ATA
485-B (–)
CAN-L
CAN-H
485-A (+)
GND
+12V
LAN
N L
CT
485 A (+)
485 B (–)
485 A (+)
485 B (–)
TERM.
PE
L1
N
kWh
L
N
Battery box
Smart Monitor
Router
Inverter
Meter cabinet
Electrical consumers to be
supplied via batteries or solar
modules in the event of
mains failure should connect
to L’ and N’ of the inverter.
Module strings
L’: 28 A max. (Stand Alone mode: 15.7 A max.)
L: 28 A max.
Содержание Hybrid E5
Страница 1: ...Hybrid E5 Battery Storage System Installation instructions Europe United Kingdom ...
Страница 58: ...58 Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018 09 17 Space for notes ...
Страница 59: ...59 Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018 09 17 Space for notes ...