21
Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17
Planning the installation
N’
L’
N
L
BT
CAN
DC2
DC1
PE
D
ATA
GND
VCC
D
ATA
D
ATA
D
ATA
485-B (–)
CAN-L
CAN-H
485-A (+)
GND
+12V
LAN
L1 L2 L3
CT
N
485 A (+)
485 B (–)
485 A (+)
485 B (–)
TERM.
PE
L3
L2
L1
N
kWh
L3
L2
L1
N
Battery box
Smart Monitor
Router
Inverter
Meter cabinet
Module strings
All other electrical consumers
can be connected to any given
phase.
L’: 28 A max. (Stand Alone mode: 15.7 A max.)
L: 28 A max.
Electrical consumers to be
supplied via batteries or solar
modules in the event of
mains failure should connect
to L’ and N’ of the inverter.
Circuit diagram for 3-phase grids
Содержание Hybrid E5
Страница 1: ...Hybrid E5 Battery Storage System Installation instructions Europe United Kingdom ...
Страница 58: ...58 Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018 09 17 Space for notes ...
Страница 59: ...59 Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018 09 17 Space for notes ...