9
Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17
Scope of supply
R4E Smart Monitor
Power supply (not suitable for Germany).
Power is supplied via the inverter.
1 x sensor cable for 3 current
clamps (2 m)
Power meter: P1E or P3E
1 single-phase power meter (to be
affixed to DIN rail)
3 insulated cable lugs
3 current clamps
1 plug for RS485
connection
1 DIN rail, 12.5 cm (incl. 2 screws for wall
mounting)
2 stoppers for power meter (to be
affixed to DIN rails)
1 three-phase power meter (to be
affixed to DIN rails)
Scope of supply, P1E only
Scope of supply, P3E only
Scope of supply P1E and P3E
R4E Smart Monitor
1 current clamp
5 insulated cable lugs
1 x sensor cable for 1 current
clamp (2 m)
2 mounting screws for fas-
tening to the wall
Содержание Hybrid E5
Страница 1: ...Hybrid E5 Battery Storage System Installation instructions Europe United Kingdom ...
Страница 58: ...58 Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018 09 17 Space for notes ...
Страница 59: ...59 Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018 09 17 Space for notes ...