35
Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17
Readying charging cables for use and connecting them
Cable requirements
The plugs provided with the battery box have the following
technical characteristics:
Plug type
Phoenix Contact
PV-CM-S 6-16
PV-CF-S 6-16
Cable type
PV1-F
● Charging
30 A
● Discharging
35 A
Permissible wire cross-
section
6 / 10 / 16 mm
2
Stripping length
18 mm
Connect plug to charging cable
18
2
3
4
3 Nm
5
18 mm (M12)
1
18 mm (M12)
1. Strip the charging cable to 18 mm using a wire strip-
per. Ensure that the individual wires are not damaged
or cut off.
2. Insert the stripped cable as far as it can go. The braid
ends must be visible in the spring.
3. Press the spring down until it clicks in.
4. Slide the rear housing section into the front housing
section.
5. Secure the rear housing section by tightening it using
an M12 open-end wrench with 3 Nm of force. Re-
verse with another M12 open-end wrench.
Connect inverter to battery box
Use only the cable types specified by the manu-
facturer of the plug connector.
Note the bend radii specified by the cable man-
ufacturer.
Содержание Hybrid E5
Страница 1: ...Hybrid E5 Battery Storage System Installation instructions Europe United Kingdom ...
Страница 58: ...58 Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018 09 17 Space for notes ...
Страница 59: ...59 Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018 09 17 Space for notes ...