53
Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17
Commissioning
A description of the operating modes is pro-
vided in the user manual.
Nederlands
Deutsch
English
Select language
1.
Use the
and
buttons to select the
English
language and then
press the
ENT
button.
UK 240V
UK 230V
Select Country
2.
Use the
and
buttons to select your country or mains type and then
press the
ENT
button.
Selling first
Peak cut
Self consump.
Set Operation Mode
3.
Use the
and
buttons to select the desired operating mode and then
press the
ENT
button.
No Yes
Mode: Self consump.
Country: UK 230V
4.
Check that the correct country and desired mode are selected.
If the correct country is selected, use the
and
buttons to select the
Yes
entry and the press the
ENT
button.
To change the selection, press the
EXIT
button.
BT 0W Grid 0W
PV 0W Load 0W
Status:Countdown 14s
2018.06.18 09:06
The inverter starts a self-test lasting approx. 30 seconds.
During the test, the remaining time is displayed and the
O
n
LED blinks.
BT 3W Netz 190W
PV 203W Haus 0W
Status: On Grid
2018.06.18 09:08
Once the self-test is completed, the standard status for the desired operat-
ing mode is displayed and the
O
n
LED is continuously illuminated.
Содержание Hybrid E5
Страница 1: ...Hybrid E5 Battery Storage System Installation instructions Europe United Kingdom ...
Страница 58: ...58 Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018 09 17 Space for notes ...
Страница 59: ...59 Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018 09 17 Space for notes ...