43
Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17
Connecting inverter and Smart Monitor via RS485
1. Break out the cable insertion tab on the underside of
the Power Monitor.
Connecting RS485 and voltage supply
2
1
2. Connect and insert the RS485 cable coming from
the inverter to the RS485 plug.
1
12V voltage supply for inverter (
VCC
and
Gnd
terminals)
2 dAtA+
and
dAtA–
for the inverter
Connecting to router (optional)
3. Plug the network cable coming from the router into
the LAN connection.
Содержание Hybrid E5
Страница 1: ...Hybrid E5 Battery Storage System Installation instructions Europe United Kingdom ...
Страница 58: ...58 Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018 09 17 Space for notes ...
Страница 59: ...59 Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018 09 17 Space for notes ...