ELP AM Series - Manual 2011 - 042011
Copyright Delta UV
©
Page 11
B. 2 ELECTRICAL UNIT INSTALLATION
- Position the unit
away from water
.
- The ventilator
must not be blocked.
- Maximum cable length between the UV reactor and the electrical unit is 3
meters.
B.3 WIRING DIAGRAM
Use copper conductors only
Permanently Connected Equipment Assembly with Ultra Violet Lamps,
Ballasts and Control.
The reactor
could be turn on 24h/24
and anyway must be slaved to the filtration in order to
desinfect at the same time.
DIAGRAM: Wiring Terminal
Lug
(Provided with the
electrical unit)
Screw M6x20
(Provided with the
electrical unit)
Screw 6x30 minimum
(Not provided with
the electrical unit)
Use this hole
to fixe the
electrical unit
in the wall
Main Earthing Ground:
60°C copper. Conductors
size see page 8.
Neutral
Line
60°C copper conductors
For conductors size see
page 8.
Reactor Earthing Ground:
60°C copper. Conductors
size see page 8.