ELP AM Series - Manual 20112 – 05/12
Copyright Delta-UV
©
Page 20
E.3
QUARTZ SLEEVES : CLEANING IN PLACE
To set this operation, you need :
-
To install a PVC tank with a tranparent tube with the following dimensions : Diameter 2’’,
length 20’’. This tube will be above a PVC valve.
-
1 liter of muriatic acid
STEP OPERATION
1
Close the valves 2 and 3 et open the valve 1
2
Fill the PVC tank with 1 liter of muriatic acid
3
Open the valve 4
4
Open slowly the valve 5 till the level of the PVC goes down, then close
valve 5
5
Close valve 4
6
Leave it during 1 hour
7
Open the valve 5 and empty the UV reactor
8
Close the valve 4 and 5
9
Run the UV reactor on
-
Open the valve 2
-
Open slowly the valve 3
-
Close the valve 1
Valve 1
Valve 2
Outlet
Valve 3 :
Inlet
Valve 4
Valve 5
Transparent PVC
tank
20’’