Ra c k I n s t a l l a t i o n G u i d e
1-23
F i g u r e 1 - 1 6 .
I n s t a l l i n g t h e S t i f f e n i n g B r a c k e t a n d C a b l e Tr a y
Flush-Mount Installation
The two-post rack kit is shipped with the brackets configured for center-mount installation.
To prepare the slide assemblies for flush-mount installation in the two-post rack, perform
the following steps:
1
Locate the two slide assemblies and place them side by side on a smooth work surface,
with the front ends of the slide assemblies toward you and the center brackets facing
upward (see Figure 1-17).
NOTE:
To prepare the slide assemblies for flush-mount installation, remove the front
mounting bracket, rotate it 180 degrees, and reinstall it on the opposite slide assembly.
stiffening bracket
12-24 x 0.5-inch pan-head
Phillips screws (1 per side)
holes for stiffening bracket
with 6-inch racks
slide assemblies (2)
holes for stiffening bracket
with 3-inch racks
hooks (4)
cable tray
JO525bk0.book Page 23 Monday, January 27, 2003 12:29 PM
Содержание PowerVault 725N
Страница 6: ...6 Contents JO525bk0 book Page 6 Monday January 27 2003 12 29 PM ...
Страница 42: ...6 Sommaire JO525fbk0 book Page 6 Monday January 27 2003 12 55 PM ...
Страница 82: ...6 Inhalt JO525bk0 book Page 6 Monday January 27 2003 1 11 PM ...
Страница 122: ...6 目次 JO525jbk0 book Page 6 Monday January 27 2003 3 13 PM ...
Страница 152: ...4 30 ラック取り付けガイド w w w d e l l c o m s u p p o r t d e l l c o m JO525jbk0 book Page 30 Monday January 27 2003 3 13 PM ...
Страница 160: ...6 Contenido JO525sbk0 book Page 6 Monday January 27 2003 4 29 PM ...