NOTE:
Support the system with both hands while sliding it out of the enclosure.
NOTE:
Removing the sled with the enclosure powered on is supported if you shut down the sled before removal.
Figure 11. Removing the sled from enclosure
3. Install the I/O connector cover on the sled.
CAUTION:
To protect the I/O connector pins, install the I/O connector cover every time a sled is removed
from the enclosure.
Figure 12. Installing the I/O connector cover on sled
Installing and removing system components
23
Содержание EMC PowerEdge MX750c
Страница 11: ...System information label Figure 5 Mechanical overview Dell EMC PowerEdge MX750c system overview 11 ...
Страница 12: ...Figure 6 Memory overview 12 Dell EMC PowerEdge MX750c system overview ...
Страница 13: ...Figure 7 System board Figure 8 Jumper settings Dell EMC PowerEdge MX750c system overview 13 ...
Страница 14: ...Figure 9 Quick Resource Locator Figure 10 System tasks 14 Dell EMC PowerEdge MX750c system overview ...