5.2
Check points before commissioning
5.2.1.
Preparing the boiler for commissioning
WARNING
Do not put the boiler into operation if the supplied gas is
not in accordance with the approved gas types.
Preparatory procedure for boiler commissioning:
4
Check that the gas type supplied matches the data shown on the
boiler's data plate.
4
Check the gas circuit.
4
Check the hydraulic circuit.
4
Check the water pressure in the heating system.
4
Check the electrical connections to the thermostat and the other
external controls.
4
Check the other connections.
4
Test the boiler at full load. Check the setting of the gas/air ratio
and, if necessary, correct it.
4
Test the boiler at part load. Check the setting of the gas/air ratio
and, if necessary, correct it.
4
Finalizing work.
5.2.2.
Gas circuit
AGC 10/15 - AGC 15 - AGC 25 - AGC 35
5. Commissioning
20/01/2012 - 300026081-001-B
67
Содержание AGC 10/15
Страница 7: ...20 01 2012 300026081 001 B 5 ...
Страница 130: ...9 Spare parts AGC 10 15 AGC 15 AGC 25 AGC 35 128 20 01 2012 300026081 001 B ...
Страница 131: ......