Z
Connect the solar station to the solar collectors.
E
Solar sensor probe.
R
Connect the heating pump (Circuit A).
T
Outside sensor.
Y
Buffer tank.
U
Connect the sensor from the storage tank (Package
AD250).
I
Connect the DHW sensor (Package AD212).
O
Connect the DHW tank anode.
If the tank is not fitted with an impressed current
anode, put the simulation connector in place
(delivered with the DHW sensor - package
AD212).
P
Do not connect anything to the terminal block.
Settings to be made for this type of installation
Parameters
Access
Settings to be made See chapter
INSTALLATION
Installer level
#SYSTEM
menu
EXTENDED
¼
"Displaying the parameters in extended mode", page
I.SYST
(1)
Installer level
#SYSTEM
menu
STORAGE TANK
¼
"Setting the parameters specific to the installation",
P.DHW:
(1)
Installer level
#SYSTEM
menu
PUMP
BOILER PUMP
Installer level
#SYSTEM
menu
ALL
(1) The parameter is only displayed if
INSTALLATION
parameter is set to
EXTENDED
The DHW part is maintained at the DHW set point by the
boiler.
The heating zone is maintained at the set temperature
calculated according to the outside temperature. The zone
is reheated when the heating buffer temperature sensor
U
falls -6°C below the calculated set temperature.
Reheating in the heating zone stops when the heating
buffer temperature rises above the calculated set
temperature.
n
PS storage tank and DHW tank connected to the boiler
The boiler only starts up if the buffer tank is not hot enough to handle
the heating.
4. Installation
AGC 10/15 - AGC 15 - AGC 25 - AGC 35
48
20/01/2012 - 300026081-001-B
Содержание AGC 10/15
Страница 7: ...20 01 2012 300026081 001 B 5 ...
Страница 130: ...9 Spare parts AGC 10 15 AGC 15 AGC 25 AGC 35 128 20 01 2012 300026081 001 B ...
Страница 131: ......