USE AND OPERATIONS
37
4
4. USE AND OPERATIONS
4.1 TURNING ON SEQUENCE
Before turning on the marking system, be sure that the system is connected as previously described. Check
presence of voltage power supply connection, Aux interlock connector, Control Box connector and USB
cable as described in the previous chapter.
SIGNAL
STATUS
KEY
OFF
SHUTTER EN
OFF
1
ST
step:
turn on the main switch in the back of the marking system:
Figure 25: Power on.
If power supply input is correct green LED indicator on back panel will light on otherwise if there is a
reversed voltage input red LED indicator on back panel will light on. Refer to troubleshooting paragraph in
case of error:
Figure 26: Green and red LED on back panel.
Содержание Ulyxe PL
Страница 1: ...USER S MANUAL Ulyxe PLTM ...
Страница 27: ...TECHNICAL SPECIFICATIONS 27 2 EXAMPLE OF CONNECTION TO PLC Figure 18 Example of connection to PLC ...
Страница 56: ...56 LABELS LOCATION Figure 44 External labels location ...
Страница 66: ...66 APPENDIX D MECHANICAL DRAWINGS NOTE Please refer to Datalogic website for detailed drawings ...
Страница 68: ...68 ...