CONTROL RACK INSTALLATION
USER MANUAL
15
Vertical installation
The control rack must be positioned in a safe manner, following the recommendations
below.
NOTE
Figure 7: Control rack vertical positioning
Figure 8: Control rack fixing points for vertical installation
The feet must be removed from the bottom of the control rack and installed
on the left side of the control rack using the appropriate fixing points.
Tightening torque = 0.5 Nm.
CAUTION
The control rack MUST be fixed to a side wall using the appropriate fixing
points placed on the bottom of the
control
rack.
Содержание Arex 400
Страница 1: ...AREX 400 USER MANUAL InfraRed Fiber Laser Marker ...
Страница 64: ...NOTE SET UP 56 AREX 400 Figure 7 Connecting the monitor Minimum monitor resolution 800 x 600 VGA standard ...
Страница 145: ...USER MANUAL 137 APPENDIX H MECHANICAL DRAWINGS ...
Страница 146: ...MECHANICAL DRAWINGS 138 AREX 400 CONTROL RACK NOTE Please refer to Datalogic website for detailed drawings ...
Страница 147: ...SCAN HEAD USER MANUAL 139 SCAN HEAD NOTE Please refer to Datalogic website for detailed drawings ...