Installation
Verifying Your Connections
060R115-000
DataComm V.34 PL Modem
2-7
Issue 1
Installation and Operation
DTE Cables
With the TIA/EIA-232-F (ITU-T V.24/V.28/ISO 2110) DTE interface, use standard
TIA/EIA-232-F cables.
Verifying Your Connections
Your modem should now be connected. To verify that the power supply is connected properly, see
if the display on the front panel is flashing decimal point four (refer to
Chapter 3, Operation
for
front panel operation). If not, reset the modem. If decimal point four still does not flash, then either
the power supply is not connected properly, or the modem is not functioning.
19
R
45
T1
20
R1
46
not used
21
not used
47
T
8/16
22
R
48
T1
23
R1
49
not used
24
not used
50
UNASSIGNED
-
25
UNASSIGNED
Table 2-2
50-Pin VF Connector Pinout (Telco 50-Pin Backplane)
50-Pin Connector
Private Line
(Option X6)
Line
(Sheet 2 of 2)
Содержание V.34 PL
Страница 1: ...DataComm V 34 PL Modem Installation and Operation 060R115 000 Issue 1 ...
Страница 2: ......
Страница 3: ...060R115 000 Issue 1 DataComm V 34 PL Modem Installation and Operation ...
Страница 10: ......
Страница 16: ...Introduction Equipment List 1 4 DataComm V 34 PL Modem 060R115 000 Installation and Operation Issue 1 ...
Страница 36: ...Operation Operating Procedures 3 12 DataComm V 34 PL Modem 060R115 000 Installation and Operation Issue 1 ...
Страница 46: ...Tests End to End Self Test 4 10 DataComm V 34 PL Modem 060R115 000 Installation and Operation Issue 1 ...
Страница 50: ...Technical Specifications A 4 DataComm V 34 PL Modem 060R115 000 Installation and Operation Issue 1 ...
Страница 55: ......
Страница 56: ......