6.4 Switching the Connection Box on
The components of the ISD servo system must be wired
and connected correctly before the connection box is
switched on. Read the operating instructions of the other
ISD components carefully.
The cabling contains the power supply as well as the
communication for the system. The servo system cannot
be started until these basic requirements are fulfilled.
Switching on (booting up)
The connection box can be switched on via the CAN
communication from the PLC system if the Auto Power-up
parameter is enabled.
CAUTION
Do not switch the connection box on and off repeatedly.
Doing so will damage the internal components.
Wait 5 minutes after switching the connection box off
before switching it on again.
Commissioning
VLT
®
ISD Connection Box Operating Instructions
34
MG75G102 - VLT
®
is a registered Danfoss trademark
6
6
Содержание VLT ISD Connection Box
Страница 1: ...MAKING MODERN LIVING POSSIBLE Operating Instructions VLT ISD Connection Box...
Страница 2: ......
Страница 57: ...Index VLT ISD Connection Box Operating Instructions MG75G102 VLT is a registered Danfoss trademark 55...
Страница 58: ...www danfoss com drives MG75G102 175R1124 MG75G102 Rev 2012 10 29...