16. Check for forward and reverse machine operation, with the prime mover at normal operating speed.
Charge pressure may decrease slightly during forward or reverse operation.
17. Continue to cycle slowly between forward and reverse for at least five minutes.
18. Shut down prime mover.
19. Remove gauges. Replace plugs at the gauge ports.
20. Check reservoir level. Add filtered fluid if needed.
The motor/transmission is now ready for operation.
Service Manual
H1 Bent Axis Motors, Size 060/080/110/160/210/250 cm3
Initial startup procedures
©
Danfoss | August 2018
AX00000025en-US0504 | 29