background image

Manual 

EKC 315A  Industrial Evaporator Controller 

 

USCO.PD.RD0.A1.22 / 521U0092

 

© Danfoss USCO (HMR_MKS), 04-2008

Quick Setup Guide

NOTE:  For most applications, only the below parameters need to be reviewed and possibly changed.  For each parameter, record your setting and 

other pertinent settings if any, in the “Field Settings” column provided in each parameter table on the following pages. After going through the quick 

start procedure below, it is best to review the complete parameter list to ensure all needed changes have been done for your application.

Essential settings that must be made before others will take effect: 

1)  If the controller is already wired it may be best to put the controller into standby by setting parameter r12 to OFF.  This way the controller 

will not try to regulate while setting up the parameters.  If this is done, parameter r12 must be changed back to ON for the controller to 

regulate.

2)  The desired units must be set prior to programming any settings.  For the units to be entered and displayed in °F and psig, parameter r05 

must be changed to F-P (the default units are °C and bar pressure).

3)  Change parameter o12 to 60 Hz unless the supply is 50 Hz. 

Setting up the controller for superheat regulation

1)  Select the valve that is being used, parameter o09.  Typical settings are par. o09=4 when using the pulse-width expansion valve type 

AKVA or par. o09=7 when using the ICM motor valve with ICAD motor actuator’s default settings input setting.

2)  Enter the pressure transmitters working range in parameters o20 (min value) and o21 (max. value).  Note:  These settings must be entered 

in gauge pressure and most transmitter ranges are listed in absolute pressure which will need converted to gauge pressure before 

entered.

3)  Select the refrigerant that is being used, parameter o30.  For R717 (ammonia) that setting would be par. o30=5.

4)  Set the superheat regulation method, parameter n21.  For industrial refrigeration systems, it is best to try load-defined superheat 

regulation which would be par. n21=2.

5)  The controller will regulate superheat based on a user-defined superheat range in parameters n09 and n10.  It is best to leave these at the 

default settings and later fine tune them if needed.  

Note:  parameter n10 must be set higher than parameter n22.

6)  For most applications the shaded parameters in the parameter list should not be changed.

7)    Verify that parameter r12 is ON. 

Setting up the thermostat function for controlling a liquid line solenoid valve

The additional temperature sensor S3 must be installed for use of the thermostat function.  The controller will then control the solenoid relay 

and alarm relay based on the sensor S3 reading and the user defined setpoints.

1)  Set the thermostat set point.  This setting is not changed by entering the parameter list, but by pushing both buttons simultaneously.

2)  Set the differential for the thermostat function, parameter r01.

3)  Turn on the thermostat function with parameter r14 (r14=1 for ON).

4)  If desired, set up the alarm parameters A1, A2 and A3.

5)    Verify that parameter r12 is ON. 

Содержание EKC 315A

Страница 1: ...Manual REFRIGERATION AND AIR CONDITIONING Superheat controller EKC 315A...

Страница 2: ...ring 3 Operating principle 3 Operating the EKC 315A 4 5 Quick Setup Guide 6 Survey of functions settings and parameters 7 10 Service parameters for troubleshooting 11 Technical data 11 Wiring diagram...

Страница 3: ...ively small refrigerant charge the type ICM valve is recommended In systems with an AKV A valve the capacity can be distributed by using up to three valves in parallel When using more than one AKV A p...

Страница 4: ...r an error in regulation In this situation pushing the upper button for 1 second will cause the alarm or error code to be displayed When an alarm code is displayed by pushing the upper button the alar...

Страница 5: ...parameter you have scrolled to Press the both buttons simultaneously To increase the setting Press the upper button To decrease the setting Press the lower button To save the new setting and return to...

Страница 6: ...actuator s default settings input setting 2 Enter the pressure transmitters working range in parameters o20 min value and o21 max value Note These settings must be entered in gauge pressure and most t...

Страница 7: ...for example for loss due to a long sensor cable r09 18 F 10 K 18 F 10 K 0 F 0 K Offset of temperature sensor S3 signal To calibrate the sensor reading or to compensate for example for loss due to a lo...

Страница 8: ...half n19 0 2 1 0 0 3 Amplification factor for superheat only in 1 1 systems This setting determines the ICM or AKV valve s opening degree as a function of the change in evaporating pressure An increas...

Страница 9: ...fset At maximum AI the offset will be as set in parameter r06 o10 0 4 0 Frequency Must be set to the frequency of the 24 Vac power source o12 0 50 Hz 1 60 Hz 0 50 Hz Selection of normal display conten...

Страница 10: ...F 35 C Value of analog output at maximum current terminals 2 5 only applicable to AKV A or TQ Upper end of temperature or opening degree range that will yield a current output of 20 mA o28 94 F 70 C 3...

Страница 11: ...ctive complied and EMC demands re CE marking complied with LVD tested according to EN 60730 1 and EN 60730 2 9 EMC tested according to EN50081 1and EN 50082 2 Service Parameters for Troubleshooting vi...

Страница 12: ...tional power source needed Terminal pairs Description 17 18 Signal from TQ discontinued valve actuator See Appendix 1 for TQ wiring diagram 18 19 Optional current input from PLC or other source for of...

Страница 13: ...er than the integration time Tn parameter n05 time Tp Tn Tn is say 240 seconds 1 Increase Tn to 1 2 times Tp 2 Wait until the system is in balance again 3 If there is still oscillation reduce Kp initi...

Страница 14: ...o types of superheat regulation load defined control and adaptive control are shown below For industrial refrigeration applications load defined control should be tried first Load defined superheat Th...

Страница 15: ...Manual EKC 315A Industrial Evaporator Controller 15 USCO PD RD0 A1 22 521U0092 Danfoss USCO HMR_MKS 04 2008...

Страница 16: ...O PD RD0 A1 22 521U0092 Danfoss USCO HMR_MKS 04 2008 Danfoss Inc Refrigeration Air Conditioning Division 7941 Corporate Drive Baltimore MD 21236 Ph 410 931 8250 Fax 410 931 8256 E mail baltimore danfo...

Отзывы: