
Cascade Controller Option
Installation and
Wiring Instructions
■
7. Connect Option Card Ribbon Cable to
VLT Control Board
•
Pull up collar (A) of control board ribbon
cable socket.
•
DO NOT remove blue insulation on end of
option card ribbon cable. Insert ribbon cable
into corresponding socket (B) on VLT control
board and push collar closed. Be sure not
to crimp ribbon cables.
•
Repeat procedure for all ribbon cables.
MG.60.I3.02 - VLT is a registered Danfoss trademark
13