![DANA Spicer Torque-Hub S350 Series Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/dana/spicer-torque-hub-s350-series/spicer-torque-hub-s350-series_service-manual_504702027.webp)
27
9.
Roll all the Planet Gears (17B) to insure they roll freely.
10.
Install Adapter (17D) with flange side down onto the Carrier (17A).
11.
Apply Loctite-243 and install Hex Bolts (17E) into Carrier (17A) through Adapter
(17D).Torque bolts to 80ft-lbs
This concludes the Output Carrier Subassembly.
Содержание Spicer Torque-Hub S350 Series
Страница 1: ...1 Torque Hub Planetary Final Drive S350 Series Service Manual Rev 04 11 13 ...
Страница 10: ...10 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 11: ...11 DISASSEMBLY ...
Страница 16: ...16 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 24: ...24 ASSEMBLY ...
Страница 43: ...43 Planetary Final Drive Service Manual Assembly Drawing ...
Страница 47: ...47 Planetary Final Drive Repair Instructions Assembly Tools T149933 LOCKNUT WRENCH ...
Страница 48: ...48 T158149 BEARING CUP PRESS TOOL ...
Страница 49: ...49 T170237 LEAK TEST ADAPTOR ...
Страница 50: ...50 T214147 ASSEMBLY PRESSING TOOL ...
Страница 51: ...51 T216332 ASSEMBLY PRESSING TOOL ...
Страница 52: ...52 T222390 LEAK TEST ADAPTER PLATE ...
Страница 53: ...53 T223131 LOCKNUT WRENCH ...
Страница 54: ...54 T223989 ROLL CHECKING TOOL ...