18
|
Maintenance and service
Installer and user reference guide
152
RYYQ+RYMQ+RXYQ8~20U7Y1B
VRV IV+ heat pump
4P546228-1A – 2019.10
permanent stock of essential components in order to keep your unit in operation
as long as possible. Contact your dealer for more information.
When asking your dealer for an intervention, always state:
▪
The complete model name of the unit.
▪
The manufacturing number (stated on the nameplate of the unit).
▪
The installation date.
▪
The symptoms or malfunction, and details of the defect.
WARNING
▪
Do not modify, disassemble, remove, reinstall or repair the unit yourself as
incorrect dismantling or installation may cause an electric shock or fire. Contact
your dealer.
▪
In case of accidental refrigerant leaks, make sure there are no naked flames. The
refrigerant itself is entirely safe, non-toxic and non-combustible, but it will
generate toxic gas when it accidentally leaks into a room where combustible air
from fan heaters, gas cookers, etc. is present. Always have qualified service
personnel confirm that the point of leakage has been repaired or corrected
before resuming operation.
18.4.3 Recommended maintenance and inspection cycles
Be aware that the mentioned maintenance and replacement cycles do not relate to
the warranty period of the components.
Component
Inspection
cycle
Maintenance cycle
(replacements and/or repairs)
Electric motor
1 year
20,000 hours
PCB
25,000 hours
Heat exchanger
5 years
Sensor (thermistor, etc.)
5 years
User interface and switches
25,000 hours
Drain pan
8 years
Expansion valve
20,000 hours
Solenoid valve
20,000 hours
The table assumes the following conditions of use:
▪
Normal use without frequent starting and stopping of the unit. Depending on the
model, we recommend not starting and stopping the machine more than 6
times/hour.
▪
Operation of the unit is assumed to be 10 hours/day and 2,500 hours/year.
NOTICE
▪
The table indicates main components. Refer to your maintenance and inspection
contract for more details.
▪
The table indicates recommended intervals of maintenance cycles. However, in
order to keep the unit operational as long as possible, maintenance work may be
required sooner. Recommended intervals can be used for appropriate
maintenance design in terms of budgeting maintenance and inspection fees.
Depending on the content of the maintenance and inspection contract,
inspection and maintenance cycles may in reality be shorter than listed.
Содержание VRV IV+
Страница 165: ......
Страница 166: ......
Страница 167: ......
Страница 168: ...4P546228 1A 2019 10 Copyright 2018 Daikin Verantwortung für Energie und Umwelt ...