6
|
Installation
Installer and user reference guide
55
RYYQ+RYMQ+RXYQ8~20U7Y1B
VRV IV+ heat pump
4P546228-1A – 2019.10
Unit
Installation period
Protection method
Outdoor unit
>1 month
Pinch the pipe
<1 month
Pinch or tape the pipe
Indoor unit
Regardless of the period
Seal the piping and wiring intake holes using sealing material (field supply),
otherwise the capacity of the unit will drop and small animals may enter the
machine.
Example: passing piping out through the front.
a
a
Close the areas marked with "
". (When the piping is routed from the front
panel.)
▪
Only use clean pipes.
▪
Hold the pipe end downwards when removing burrs.
▪
Cover the pipe end when inserting it through a wall, to prevent dust and/or
particles entering the pipe.
6.4.9 To braze the pipe end
NOTICE
Precautions when connecting field piping. Add brazing material as shown in the
figure.
1
1
1
1
2
2
≤Ø25.4
>Ø25.4
▪
When brazing, blow through with nitrogen to prevent creation of large quantities
of oxidised film on the inside of the piping. This film adversely affects valves and
compressors in the refrigerating system and prevents proper operation.
▪
Set the nitrogen pressure to 20 kPa (0.2 bar) (just enough so it can be felt on the
skin) with a pressure-reducing valve.
a
b
c
d
e
f
f
a
Refrigerant piping
b
Part to be brazed
c
Taping
d
Manual valve
e
Pressure-reducing valve
f
Nitrogen
Содержание VRV IV+
Страница 165: ......
Страница 166: ......
Страница 167: ......
Страница 168: ...4P546228 1A 2019 10 Copyright 2018 Daikin Verantwortung für Energie und Umwelt ...