
Operation Procedure
Si39-303
208
Operation Manual
“
” “
” Heating operation
RXYQ series
REYQ series
“
” Fan only operation
RXYQ series
REYQ series
Press the on/off button.
The operation lamp lights up and the system starts operation.
Adjustment
For programming temperature, fan speed and air flow direction (only for the remote controller
BRC1A51: FXC, FXF, FXH, FXK, FXA), follow the procedure shown below.
Press the temperature setting button and program the desired temperature.
Each time this button is pressed, the temperature setting rises or lowers 1°C.
Notes:
!
Set the temperature within the operation range.
!
The temperature setting is impossible for fan only operation.
Press the fan speed control button and select the fan speed of your preference.
Press air flow direction adjust button.
Refer to the chapter “Adjusting the air flow direction” for details.
Stopping the system
Press the on/off button once again.
The operation lamp goes off and the system stops operation.
Notes:
!
Do not turn off power immediately after the unit stops, but wait for at least 5 minutes.
Explanation of heating operation
Defrost operation
!
In heating operation, freezing of the outdoor unit coil increases. Heating capability
decreases and the system goes into defrost operation.
!
The indoor unit fan stops and the remote controller displays “
”.
!
After maximum 10 minutes of defrost operation, the system returns to heating operation
again.
Hot start
!
In order to prevent cold air from blowing out of an indoor unit at the start of heating
operation, the indoor fan is automatically stopped. The display of the remote controller
shows “
”.
2
3
4
5
6
Содержание VRV II Series
Страница 6: ...Si39 303 iv Table of Contents...
Страница 31: ...Si39 303 Installation General Information 25 Flaring Procedure...
Страница 124: ...Appendix Si39 303 118 General Information 3P114237A...
Страница 130: ...Appendix Si39 303 124 General Information BHFP22M135 Refer P 120 for Table 7 8 and 9 After connection piping...
Страница 140: ...Appendix Si39 303 134 General Information 7 10 Piping System Diagrams 7 10 1 Outdoor Unit RXYQ5MY1B...
Страница 141: ...Si39 303 Appendix General Information 135 RXYQ8MY1B RXYQ10MY1B RXYQ12MY1B 4D040338A...
Страница 142: ...Appendix Si39 303 136 General Information RXYQ14MY1B RXYQ16MY1B 4D040339A...
Страница 144: ...Appendix Si39 303 138 General Information 7 11 Wiring Diagrams 7 11 1 Outdoor Unit RXYQ5MY1B...
Страница 145: ...Si39 303 Appendix General Information 139 RXYQ8MY1B RXYQ10MY1B RXYQ12MY1B 3D038582...
Страница 146: ...Appendix Si39 303 140 General Information RXYQ14MY1B RXYQ16MY1B 3D038058...
Страница 147: ...Si39 303 Appendix General Information 141 7 11 2 Field Wiring RXYQ5 16MY1B 3D040746...
Страница 148: ...Appendix Si39 303 142 General Information RXYQ18 32MY1B 3D040747...
Страница 149: ...Si39 303 Appendix General Information 143 RXYQ34 48MY1B 3D040748...
Страница 158: ...Appendix Si39 303 152 General Information...
Страница 180: ...Refrigerant Piping Si39 303 174 Installation Manual...
Страница 226: ...Troubleshooting Si39 303 220 Operation Manual...