
Si39-303
Before Operation
Installation Manual
191
8. Before Operation
8.1
Checks Before Initial Start-up
Caution
Make sure that the circuit breaker on the power supply panel of the installation is switched off.
Attach the power wire securely.
Introducing power with a missing N-phase or with a mistaken N-phase will break the equipment.
After the installation, check the following before switching on the circuit breaker:
1. The position of the switches that require an initial setting
Make sure that switches are set according to your application needs before turning the
power supply on.
2. Power supply wiring and transmission wiring
Use a designated power supply and transmission wiring and make sure that it has been
carried out according to the instructions described in this manual, according to the wiring
diagrams and according to local and national regulations.
3. Pipe sizes and pipe insulation
Make sure that correct pipe sizes are installed and that the insulation work is properly
executed.
4. Additional refrigerant charge
The amount of refrigerant to be added to the unit should be written on the included “Added
Refrigerant” plate and attached to the rear side of the front cover.
5. Insulation test of the main power circuit
Using a megatester for 500V, check that the insulation resistance of 2M
Ω
or more is attained
by applying a voltage of 500V DC between power terminals and earth. Never use the
megatester for the transmission wiring.
6. Installation date
Be sure to keep record of the installation date on the sticker on the electric box lid according
to EN60335-2-40.
Содержание VRV II Series
Страница 6: ...Si39 303 iv Table of Contents...
Страница 31: ...Si39 303 Installation General Information 25 Flaring Procedure...
Страница 124: ...Appendix Si39 303 118 General Information 3P114237A...
Страница 130: ...Appendix Si39 303 124 General Information BHFP22M135 Refer P 120 for Table 7 8 and 9 After connection piping...
Страница 140: ...Appendix Si39 303 134 General Information 7 10 Piping System Diagrams 7 10 1 Outdoor Unit RXYQ5MY1B...
Страница 141: ...Si39 303 Appendix General Information 135 RXYQ8MY1B RXYQ10MY1B RXYQ12MY1B 4D040338A...
Страница 142: ...Appendix Si39 303 136 General Information RXYQ14MY1B RXYQ16MY1B 4D040339A...
Страница 144: ...Appendix Si39 303 138 General Information 7 11 Wiring Diagrams 7 11 1 Outdoor Unit RXYQ5MY1B...
Страница 145: ...Si39 303 Appendix General Information 139 RXYQ8MY1B RXYQ10MY1B RXYQ12MY1B 3D038582...
Страница 146: ...Appendix Si39 303 140 General Information RXYQ14MY1B RXYQ16MY1B 3D038058...
Страница 147: ...Si39 303 Appendix General Information 141 7 11 2 Field Wiring RXYQ5 16MY1B 3D040746...
Страница 148: ...Appendix Si39 303 142 General Information RXYQ18 32MY1B 3D040747...
Страница 149: ...Si39 303 Appendix General Information 143 RXYQ34 48MY1B 3D040748...
Страница 158: ...Appendix Si39 303 152 General Information...
Страница 180: ...Refrigerant Piping Si39 303 174 Installation Manual...
Страница 226: ...Troubleshooting Si39 303 220 Operation Manual...