Si39-303
Installation
General Information
15
3.2
Work Involved in Individual Operations and Points to be
Borne in Mind
3.2.1
Sleeve and Insert Work
!
Operational steps
Positioning of the
Pipe Holes
a) The through holes for the drain piping should be positioned such that the pipes have a downward
gradient. (The gradient must be at least 1/100. The thickness of the insulating materials must also be
taken into consideration.)
b) The diameter of the through holes for the refrigerant piping should include an allowance for the
thickness of the heat insulation materials. (It is a good idea to think of the liquid and gas pipes as pairs.)
c) Attention should be paid to the construction of the beam themselves since there are sometimes parts of
the beam which cannot be used to accommodate through holes.
Example:
Through holes in a reinforced concrete beam
Positioning the
Insert
a) An insert is a metal tool which is inserted into a floor or a beam before the concrete is set such that
fittings such as ducts, pipes or suspension bolts for hanging units can be fitted into place later.
The
positions of the inserts must be decided early.
Example:
Steel insert
Important point:
1. The weight of the fitting to be suspended must be taken into account when choosing the insert.
Preliminary talks
with
construction
company
Determine
position, size and
number of units
required
Carry out work
Check work
(V0957)
Содержание VRV II Series
Страница 6: ...Si39 303 iv Table of Contents...
Страница 31: ...Si39 303 Installation General Information 25 Flaring Procedure...
Страница 124: ...Appendix Si39 303 118 General Information 3P114237A...
Страница 130: ...Appendix Si39 303 124 General Information BHFP22M135 Refer P 120 for Table 7 8 and 9 After connection piping...
Страница 140: ...Appendix Si39 303 134 General Information 7 10 Piping System Diagrams 7 10 1 Outdoor Unit RXYQ5MY1B...
Страница 141: ...Si39 303 Appendix General Information 135 RXYQ8MY1B RXYQ10MY1B RXYQ12MY1B 4D040338A...
Страница 142: ...Appendix Si39 303 136 General Information RXYQ14MY1B RXYQ16MY1B 4D040339A...
Страница 144: ...Appendix Si39 303 138 General Information 7 11 Wiring Diagrams 7 11 1 Outdoor Unit RXYQ5MY1B...
Страница 145: ...Si39 303 Appendix General Information 139 RXYQ8MY1B RXYQ10MY1B RXYQ12MY1B 3D038582...
Страница 146: ...Appendix Si39 303 140 General Information RXYQ14MY1B RXYQ16MY1B 3D038058...
Страница 147: ...Si39 303 Appendix General Information 141 7 11 2 Field Wiring RXYQ5 16MY1B 3D040746...
Страница 148: ...Appendix Si39 303 142 General Information RXYQ18 32MY1B 3D040747...
Страница 149: ...Si39 303 Appendix General Information 143 RXYQ34 48MY1B 3D040748...
Страница 158: ...Appendix Si39 303 152 General Information...
Страница 180: ...Refrigerant Piping Si39 303 174 Installation Manual...
Страница 226: ...Troubleshooting Si39 303 220 Operation Manual...