
Si39-303
Operation Procedure
Operation Manual
207
6. Operation Procedure
!
Operation procedure varies according to the combination of outdoor unit and remote
controller. Read the chapter “What to do before operation”.
!
To protect the unit, turn on the main power switch 6 hours before operation.
!
If the main power supply is turned off during operation, operation will restart automatically
after the power turns back on again.
6.1
Cooling, Heating and Fan Only Operation
!
Changeover cannot be made with a remote controller whose display shows “
”
(changeover under control).
!
When the display “
” (changeover under control) flashes, refer to the chapter
“Operation procedure - Setting the master remote controller”.
!
Automatic operation can be selected only by REYQ series.
!
The fan may keep on running for about 1 minute after the heating operation stops.
!
The air flow rate may adjust itself depending on the room temperature or the fan may stop
immediately. This is not a malfunction.
For systems without cool/heat changeover remote control switch
RXYQ series
REYQ series
Press the operation mode selector button several times and select the operation mode of
your choice;
“
” Cooling operation
“
” Heating operation
“
” Automatic operation
“
” Fan only operation
Notes:
• Automatic operation (REYQ only)
In this operation mode, cool/heat changeover is automatically conducted.
Press the on/off button.
The operation lamp lights up and the system starts operation.
For systems with cool/heat changeover remote control switch
Select operation mode with the cool/heat changeover remote control switch as follows:
“
” “
” Cooling operation
RXYQ series
REYQ series
1
2
1
Содержание VRV II Series
Страница 6: ...Si39 303 iv Table of Contents...
Страница 31: ...Si39 303 Installation General Information 25 Flaring Procedure...
Страница 124: ...Appendix Si39 303 118 General Information 3P114237A...
Страница 130: ...Appendix Si39 303 124 General Information BHFP22M135 Refer P 120 for Table 7 8 and 9 After connection piping...
Страница 140: ...Appendix Si39 303 134 General Information 7 10 Piping System Diagrams 7 10 1 Outdoor Unit RXYQ5MY1B...
Страница 141: ...Si39 303 Appendix General Information 135 RXYQ8MY1B RXYQ10MY1B RXYQ12MY1B 4D040338A...
Страница 142: ...Appendix Si39 303 136 General Information RXYQ14MY1B RXYQ16MY1B 4D040339A...
Страница 144: ...Appendix Si39 303 138 General Information 7 11 Wiring Diagrams 7 11 1 Outdoor Unit RXYQ5MY1B...
Страница 145: ...Si39 303 Appendix General Information 139 RXYQ8MY1B RXYQ10MY1B RXYQ12MY1B 3D038582...
Страница 146: ...Appendix Si39 303 140 General Information RXYQ14MY1B RXYQ16MY1B 3D038058...
Страница 147: ...Si39 303 Appendix General Information 141 7 11 2 Field Wiring RXYQ5 16MY1B 3D040746...
Страница 148: ...Appendix Si39 303 142 General Information RXYQ18 32MY1B 3D040747...
Страница 149: ...Si39 303 Appendix General Information 143 RXYQ34 48MY1B 3D040748...
Страница 158: ...Appendix Si39 303 152 General Information...
Страница 180: ...Refrigerant Piping Si39 303 174 Installation Manual...
Страница 226: ...Troubleshooting Si39 303 220 Operation Manual...