Refrigerant Piping
Si39-303
170
Installation Manual
5. Protection against contamination when installing pipes
•
Take measures to prevent foreign materials like moisture and contamination from mixing
into the system.
•
Great caution is needed when passing copper tubes through walls.
Precautions when selecting branch piping.
!
If the piping between the outdoor units is 90m or longer, be sure to enlarge the main pipe in
the liquid-side and gas-side branch piping. (This does not apply to Q5 type)
Depending on the length of the refrigerant piping, the power may drop, but even in such
cases it is ok to enlarge the main pipe.
1.Outdoor unit
2.Main pipe
3.Enlarge
4.The first refrigerant branching kit.
5.Indoor unit
[Gas side]
RXYQ5MY1B type:
........... φ
15.9
→
φ
19.1 (Minimum thickness
φ
1.00mm)
RXYQ8MY1B type:
........... φ
19.1
→
φ
22.2 (Minimum thickness
φ
1.00mm)
RXYQ10MY1B type:
......... φ
22.2
→
φ
25.4 (Minimum thickness
φ
1.00mm)
RXYQ12-14MY1B type:
... φ
28.6
→
Not Increased
RXYQ16-22MY1B type:
... φ
28.6
→
φ
31.8 (Minimum thickness
φ
1.10mm)
RXYQ24MY1B type:
......... φ
34.9
→
Not Increased
RXYQ26-34MY1B type:
... φ
34.9
→
φ
38.1 (Minimum thickness
φ
1.10mm)
RXYQ36-48MY1B type:
... φ
41.3
→
Not Increased
[Liquid side]
RXYQ5MY1B type:
........... φ
9.5
→
Not Increased
RXYQ8-10MY1B type:
..... φ
9.5
→
φ
12.7 (Minimum thickness
φ
0.80mm)
RXYQ12-16MY1B type:
... φ
12.7
→
φ
15.9 (Minimum thickness
φ
1.00mm)
RXYQ18-24MY1B type:
... φ
15.9
→
φ
19.1 (Minimum thickness
φ
1.00mm)
RXYQ26-48MY1B type:
... φ
19.1
→
φ
22.2 (Minimum thickness
φ
1.00mm)
Place
Installation period
Protection method
Outdoor
More than a month
Pinch the pipe
Less than a month
Pinch or tape the pipe
Indoor
Regardless of the period
1
2
4
5
3
Содержание VRV II Series
Страница 6: ...Si39 303 iv Table of Contents...
Страница 31: ...Si39 303 Installation General Information 25 Flaring Procedure...
Страница 124: ...Appendix Si39 303 118 General Information 3P114237A...
Страница 130: ...Appendix Si39 303 124 General Information BHFP22M135 Refer P 120 for Table 7 8 and 9 After connection piping...
Страница 140: ...Appendix Si39 303 134 General Information 7 10 Piping System Diagrams 7 10 1 Outdoor Unit RXYQ5MY1B...
Страница 141: ...Si39 303 Appendix General Information 135 RXYQ8MY1B RXYQ10MY1B RXYQ12MY1B 4D040338A...
Страница 142: ...Appendix Si39 303 136 General Information RXYQ14MY1B RXYQ16MY1B 4D040339A...
Страница 144: ...Appendix Si39 303 138 General Information 7 11 Wiring Diagrams 7 11 1 Outdoor Unit RXYQ5MY1B...
Страница 145: ...Si39 303 Appendix General Information 139 RXYQ8MY1B RXYQ10MY1B RXYQ12MY1B 3D038582...
Страница 146: ...Appendix Si39 303 140 General Information RXYQ14MY1B RXYQ16MY1B 3D038058...
Страница 147: ...Si39 303 Appendix General Information 141 7 11 2 Field Wiring RXYQ5 16MY1B 3D040746...
Страница 148: ...Appendix Si39 303 142 General Information RXYQ18 32MY1B 3D040747...
Страница 149: ...Si39 303 Appendix General Information 143 RXYQ34 48MY1B 3D040748...
Страница 158: ...Appendix Si39 303 152 General Information...
Страница 180: ...Refrigerant Piping Si39 303 174 Installation Manual...
Страница 226: ...Troubleshooting Si39 303 220 Operation Manual...