IM 1119-1
4
www.DaikinApplied.com
RCN Installation
T9000 Wireless RCN Kit No . 910108604 – Parts Included
1 .
Metal RCN Housing Box
4 .
(8) Industrial Tape Strips
2 .
RCN
5 .
(4) Self-Tapping Screws
3 .
Bezel with Overlay
Tools Required
• Wire Strippers-Cutter ▪ 1/4" Hex Nut driver
• Small Screwdriver
▪ Low-Voltage Thermostat Wiring
1 .
Disconnect all power from the unit by: switching off power
at the disconnect switch, circuit breaker or unplugging the
power cord from the receptacle.
2 .
Remove the RCN housing assembly screws to access the
control module & terminal strip.
3 .
Remove the RCN box top, bezel/overlay & control module
as one piece.
Figure 1: Remove RCN assembly screws to access control
module and terminal strip
Screw Locations (3)
Separated Assembly
4 .
Attach the RCN housing back-plate to a temperature
sufficient location.
a .
Attach RCN housing back-plate to a suitable location,
preferably avoiding extreme temperature conditions and
ranges.
Note:
If mounting the RCN to the Daikin HVAC product, be
cautious when drilling holes, as not to damage any internal unit
components.
Figure 2: Mounting RCN box with screws
b .
Daikin has also provided double-sided industrial
adhesive tape that may alternately be used to secure
the RCN housing back-plate. Be sure to sufficiently
clean both mating surfaces before applying the tape to
achieve a longer-lasting bond. Usage of this fastening
method may further limit the temperature range of the
unit-mating surface.