SiUS12-928_B
Trial Operation and Field Settings
254
Part 8
Trial Operation and
Field Settings
1. Pump Down Operation............................................................................255
2. Forced Operation ....................................................................................256
3. Wiring Error Check Function ...................................................................257
4. Trial Operation ........................................................................................259
5. Field Settings ..........................................................................................261
5.1
Outdoor Unit ............................................................................................. 261
5.2
Indoor Unit................................................................................................ 264
6. Application of Silicon Grease to a Power Transistor and a
Diode Bridge ...........................................................................................267
Содержание SUPER MULTI NX CDXS18LVJU
Страница 1: ...Service Manual G Series J Series SiUS12 928_B Applied Models Inverter Multi Heat Pump ...
Страница 9: ...SiUS12 928_B 1 List of Functions Part 1 List of Functions 1 Functions 2 ...
Страница 15: ...SiUS12 928_B 7 Specifications Part 2 Specifications 1 Indoor Unit 8 2 Outdoor Unit 13 ...
Страница 118: ...SiUS12 928_B CTXS L FTXS L Series Operation Manual 110 3 12 Quick Reference Quick Reference C 3P297290 1 C 3P297290 2 ...
Страница 140: ...SiUS12 928_B CDXS L FDXS L Series Operation Manual 132 5 10 Quick Reference Quick Reference C 3P297290 3 ...