
SiE12-411
Outdoor Unit (50 / 52 / 58 / 68 / 75 Class)
Removal Procedure
249
2.5
Removal of Sound Insulation
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1
Remove 5 screws of
the right side panel.
2
Remove 2 screws of
the partition board, and
remove the board.
3
Remove the noise
insulation (top, outer
and inner).
Right
s
ide
p
a
nel
P
a
rtition
b
o
a
rd
S
o
u
nd in
su
l
a
tion (top)
S
o
u
nd in
su
l
a
tion (top inner)
S
o
u
nd in
su
l
a
tion
(inner)
S
o
u
nd in
su
l
a
tion
(o
u
ter)
C
a
ref
u
lly remove the noi
s
e
in
su
l
a
tion, which i
s
e
as
ily
torn in the piping
s
ection.
Содержание Super Multi NX C-Series
Страница 1: ...SiE12 411 Service Manual C Series Applied Models Inverter Multi Cooling Only Inverter Multi Heat Pump...
Страница 6: ...SiE12 411 Table of Contents v Index i Drawings Flow Charts v...
Страница 7: ...SiE12 411 vi Table of Contents...
Страница 67: ...Specifications SiE12 411 56 Specifications...
Страница 129: ...Instruction SiE12 411 118 System Configuration CDK X D 25 35 50 60 C Indoor Unit 3 6 8 9 10 7 1 4 5 2...
Страница 171: ...Instruction SiE12 411 160 System Configuration...
Страница 225: ...Check SiE12 411 214 Service Diagnosis...
Страница 266: ...SiE12 411 Others 255 Part 8 Others 1 Others 256 1 1 Test Run from the Remote Controller 256 1 2 Jumper Settings 257...
Страница 295: ...SiE12 411 iv Index...