
SiE12-411
Outdoor Unit (80 / 90 Class)
Removal Procedure
233
1.7
Removal of Sound Insulation and Reactor
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1
Release the clip fixing
the compressor lead
wire.
2
Remove 2 screws of
the partition board, and
move the board
leftward.
"
The partition board is not
removable as it is fixed with
the fitting screw in the rear
bottom.
3
Remove the noise
insulation (outer).
"
Carefully remove the noise
insulation, which is easily
torn in the piping section.
Clip
P
a
rtition
b
o
a
rd
fitting
s
crew
Noi
s
e in
su
l
a
tion
(o
u
ter)
Содержание Super Multi NX C-Series
Страница 1: ...SiE12 411 Service Manual C Series Applied Models Inverter Multi Cooling Only Inverter Multi Heat Pump...
Страница 6: ...SiE12 411 Table of Contents v Index i Drawings Flow Charts v...
Страница 7: ...SiE12 411 vi Table of Contents...
Страница 67: ...Specifications SiE12 411 56 Specifications...
Страница 129: ...Instruction SiE12 411 118 System Configuration CDK X D 25 35 50 60 C Indoor Unit 3 6 8 9 10 7 1 4 5 2...
Страница 171: ...Instruction SiE12 411 160 System Configuration...
Страница 225: ...Check SiE12 411 214 Service Diagnosis...
Страница 266: ...SiE12 411 Others 255 Part 8 Others 1 Others 256 1 1 Test Run from the Remote Controller 256 1 2 Jumper Settings 257...
Страница 295: ...SiE12 411 iv Index...