Test Operation
SiE 00-07
80
Test Operation R-407C PLUS Series
Note:
Resetting of power supply switch is neccessary after capacity setting.
1
Transmission terminal
Indoor unit, Cool/Heat selector
Outdoor - Outdoor
2
Service monitor LED (Green)
3
Function setting mode switch
and LED
LED
4
Function of setting between
cooling and heating
5
Outdoor unit
Capacity setting switch
Switches for capacity setting when the outdoor unit PC board is replaced
to spare parts PC board.
Refer table below.
HAP
LED-A
SERV. MON.
(V0836)
C/H SELECT
IN/D
OUT/D
SS1
(V0838)
SS2
B
D
F
H
SS3
SS4
SS5
A
C
E
G
(V0848)
SS2
SS3
SS4
SS5
A
B
C
D
E
F
G
H
RSXYP16KJ
RSXYP18KJ
RSXYP20KJ
RSXYP24KJ
RSXYP26KJ
RSXYP28KJ
RSXYP30KJ
Capacity setting table
Содержание FXYBP20K7V1
Страница 1: ...System R 407C PLUS Series Service Manual SiE 00 07 ...
Страница 11: ...Introduction SiE 00 07 x ...
Страница 17: ...Product Outline SiE 00 07 6 General Information R 407C PLUS Series ...
Страница 41: ...Specifications SiE 00 07 30 Specifications R 407C PLUS Series ...
Страница 90: ...SiE 00 07 Test Operation Test Operation R 407C PLUS Series 79 1 3 Outdoor Unit PC Board Ass y Outdoor Unit ...
Страница 119: ...Test Operation SiE 00 07 108 Test Operation R 407C PLUS Series ...
Страница 132: ...SiE 00 07 Troubleshooting by Remote Controller Troubleshooting R 407C PLUS Series 121 ...