Water supply

Fill the water piping, taking into account the minimum water volume
required by the unit. Refer to the "installation manual".

Make sure that the water is of the quality as mentioned in the
installation manual.

Purge the air at the high points of the system and check the operation
of the circulation pump and the flowswitch.

Power supply connection and crankcase heating

To switch on the crankcase heater proceed as follows:

1

Switch on the circuit breaker on the local supply panel. Make
sure that the unit is "OFF".

2

The crankcase heater is switched on automatically.

3

Check the supply voltage on the supply terminals L1, L2, L3,  by
means of a voltmeter. The voltage must correspond to the
voltage indicated on the identification label of the unit. If the
voltmeter reads values which are not within the ranges specified
in the technical data, check the field wiring and replace the
supply cables if necessary.

4

Check the LED on the reverse phase protectors. If it lights up,
the phase order is correct. If not, switch off the circuit breaker
and call a licensed electrician to connect the wires of the power
supply cable in the correct phase order.

5

Check if the crankcaseheaters are warming up.

After 8 hours, the unit is ready for operation.

Fancontactor connection and operation

The compressor starts in 12%

 for a period of 5 seconds. The field

supplied relay(s) between terminal 90 and 91 are activated.

After 5 seconds, the compressor-running changes over from 

 into

 for a period of 15 seconds. The compressor load stays at 12%.

During this period, the additional field supplied relay(s) between
terminal 92 and 93 are activated.

Between terminal 94 and 95 a third and final fancontactor can be
activated.

From then onwards, if manual mode or automatic mode is used, the
field supplied relays are switched on or off according to the fan-step
load-up control.

General recommendations

Before switching on the unit, read following recommendations:

1

When the complete installation and all necessary settings have
been carried out, close all front panels of the unit.

2

The service panels of the switch boxes may only be opened by a
licensed electrician for maintenance purposes.

3

To prevent the evaporator from freezing and to avoid damage to
the LCD displays of the digital controller, never switch off the
power supply during winter.

Legibility of the alphanumeric display may decrease at low
temperatures.

O

PERATION

The EWLD120~540 units are equipped with a digital controller
offering a user-friendly way to set up, use and maintain the unit.

This part of the manual has a task-oriented, modular structure. Apart
from the first section, which gives a brief description of the controller
itself, each section or subsection deals with a specific task you can
perform with the unit.

Depending on the model there are one or two cooling circuits in the
system. The models EWLD340~540 exist out of two circuits, whereas
the models EWLD120~260 only have one circuit. These circuits are
generally named C1 and C2 in the following descriptions. So all
information about circuit 2 (

) is not applicable for EWLD120~260

models.

Digital controller

User interface

The digital controller consists of an alphanumeric display, labelled
keys which you can press and a number of LEDs.

Digital built-in controller

Figure - Digital built-in controller

Keys:

Digital remote controller (to be ordered separately)

Figure - Digital remote controller

In order to avoid compressor damage, it is necessary to
switch on the crankcase heater for at least 8 hours before
starting the compressor after a long period of standstill.

The relay of the contacts should not exceed a current of 4A
for each connector. 

f

key, to enter the main menu

o

key, to start up or to shut down the unit.

p

key, to enter the safeties menu or to reset an alarm.

g
h

keys,  to scroll up or down through the screens of a menu
(only in case 

W

X

  or 

C

  appears) or to raise, respectively

lower a setting.

q

key, to confirm a selection or a setting.

o

key, to start up or to shut down the unit.

p

key, to enter the safeties menu or to reset an alarm.

k

key, to scroll through the screens of a menu (only in case 

W

,

X

 or 

C

 appears) or to raise, respectively lower a setting.

q

key, to confirm a selection or a setting.

u

key, to enter the readout menu.

s

key, to enter the setpoints menu.

z

key, to enter the user settings menu.

e

key, to enter the timers menu.

r

key, to enter the history menu.

t

key, to enter the info menu.

y

key, to enter the input/output status menu.

Содержание EWLD120MBYNN

Страница 1: ...OPERATION MANUAL EWLD120MBYNN EWLD170MBYNN EWLD240MBYNN EWLD260MBYNN EWLD340MBYNN EWLD400MBYNN EWLD480MBYNN EWLD500MBYNN EWLD540MBYNN Condenserless water cooled water chillers...

Страница 2: ...d water chillers Operation manual READ THIS MANUAL ATTENTIVELY BEFORE STARTING UP THE UNIT DO NOT THROW IT AWAY KEEP IT IN YOUR FILES FOR FUTURE REFERENCE Before starting up the unit for the first tim...

Страница 3: ...0 Condensor refer to engeneering specifications as published by the supplier of your remote condenser Evaporator Type brased plate heatexchanger Qty x model 2x AC250EQ NP128 1x AC250EQ NP128 1x AC250...

Страница 4: ...sor 14 Digital display controller 2 Evaporator 15 Emergency stop 3 Switchbox 16 Power supply intake 4 Compressor switchbox 17 Field wiring intake 5 Charge valve 18 Holes for lifting 6 Safety valve 19...

Страница 5: ...orator The main function of the evaporator is to take heat from the water that flows through it This is done by turning the liquid refrigerant coming from the condenser into gaseous refrigerant Water...

Страница 6: ...omes too high If this occurs shut down the unit and contact your local dealer High pressure switch Each circuit is protected by two high pressure switches S PH which measure the condenser pressure pre...

Страница 7: ...circuit 2 BEFORE OPERATION Checks before initial start up After the installation of the unit check the following before switching on the circuit breaker 1 Field wiring Make sure that the field wiring...

Страница 8: ...he switch boxes may only be opened by a licensed electrician for maintenance purposes 3 To prevent the evaporator from freezing and to avoid damage to the LCD displays of the digital controller never...

Страница 9: ...an initialization cycle is started Once all the timers have reached zero the unit starts up When the remote ON OFF control parameter is set to YES the following table applies 2 If the water chiller do...

Страница 10: ...available if voltage and current transmitters are installed This readout menu provides information concerning the voltage and the compressor current 7 Press the h key to enter the next screen of the...

Страница 11: ...s provided by the different menus In the following chapter you will find how you can set up and configure the unit using the various menu functions All menus are directly accessible using the correspo...

Страница 12: ...ot a password is needed to enter the setpoints menu To enter the service menu only a qualified installer is allowed to access this menu 2 5 4 4 2 2 1 2 2 To check the actual value of the general softw...

Страница 13: ...ther or not the discharge thermal protector or the compressor thermal protector are activated for circuit 1 To check the status of the high pressure switch the reverse phase protector and the overcurr...

Страница 14: ...to a failure circuit 1 will start up instead In the automatic mode the number of hours indicated on the display is the maximum difference between the running hours of both circuits This value is impor...

Страница 15: ...en Defining free cooling The screen of the usersettings menu allows the user to control a 3 way water valve when the unit is in free cooling state To make this possible a changeable digital output has...

Страница 16: ...the water flow through the evaporator stops after the flowstart timer has reached zero If the water flow has not restarted during the countdown the unit will shut down PUMPLEAD refer to the pump contr...

Страница 17: ...which contains the following information the time and date 2 Press h to consult the first screen This screen contains information about the unit name and the refrigerant used 3 Press h to consult the...

Страница 18: ...en a safety device was activated stop the unit and find out why the safety device was activated before resetting it Under no circum stances safety devices may be bridged or changed to a value other th...

Страница 19: ...t the inlet of the condenser may not exceed 43 C RESET After finding the cause push the button on the high pressure switch housing and reset the controller Symptom 5 4 Reverse phase protector is activ...

Страница 20: ...pecifications of the water quality Water filters Make sure to clean the waterfilter in front of the evaporator water inlet once every 4 months Check the filter for any possible damage and make sure th...

Страница 21: ...t working The diagram and table below show the default value and the upper and lower limits of the floating setpoint parameters on the evaporator INLET CONTROL Default value Lower limit Upper limit St...

Страница 22: ...ttings of groups and work similar as following example settings for group 1 ANNEX IV Free cooling working Free cooling on ambient temperature Free cooling on difference between inlet water evaporator...

Страница 23: ...2 2 q h q q g h h h g h g h g h g h g h g h g g h g h g h g h g h g h g h g h g h g h g h g h h g g g 2 f 4 4 2 5 4 4 2 4 4 4 4 4 4 4 4 4 4 0 4 4 4 4 g h g h g h q h p 2 6 g h g h 0 7 g h 3 3 2 2 2 1...

Страница 24: ...Zandvoordestraat 300 B 8400 Oostende Belgium 4PW22687 1...

Отзывы: