9
|
Electrical installation
Installer reference guide
111
EBLA09~16D + EDLA09~16D
Daikin Altherma 3 M
4P620241-1B – 2022.05
2
Push the rear plate on each of the 4 spots where the snap-fits are located.
9.2.6 To connect the shut-off valve
INFORMATION
Shut-off valve usage example.
In case of one LWT zone, and a combination of
underfloor heating and heat pump convectors, install a shut-off valve before the
underfloor heating to prevent condensation on the floor during cooling operation.
Wires: 2×0.75 mm²
Maximum running current: 100 mA
230 V AC supplied by PCB
—
1
Open the service cover. See
"7.3.2 To open the outdoor unit"
2
Connect the valve control cable to the appropriate terminals as shown in the
illustration below.
NOTICE
Only connect NO (normally open) valves.
X2M.3
X2M.4
M2S
(NO)
Содержание EBLA09D V3 Series
Страница 279: ...11 11...
Страница 280: ...4P620241 1B 2022 05 Copyright 2020 Daikin Verantwortung f r Energie und Umwelt...