9
|
Electrical installation
Installer reference guide
120
EBLA09~16D + EDLA09~16D
Daikin Altherma 3 M
4P620241-1B – 2022.05
a
b
c
d
e
K1A
K2A
X10M
×2
×4
K1A
Relay for Smart Grid contact 1
K2A
Relay for Smart Grid contact 2
X10M
Terminal block
a
Screws for X10M
b
Screws for K1A and K2A
c
Sticker to put on the high voltage wires
d
Wires between the relays and X5M (AWG22 ORG)
e
Wires between the relays and X10M (AWG18 RED)
9 10
5 6
X5M
K1A
K2A
X10M
1
2
3
4
b
b
b
b
a
a
2
Connect the low voltage wiring as follows:
X5M.4
X5M.3
S4S
S4S
Smart Grid pulse meter (optional)
3 4
1314
X5M
3
Connect the high voltage wiring as follows:
Содержание EBLA09D V3 Series
Страница 279: ...11 11...
Страница 280: ...4P620241 1B 2022 05 Copyright 2020 Daikin Verantwortung f r Energie und Umwelt...