8
|
Piping installation
Installer reference guide
113
ERLA11~W1 + EBSH/X(B)11+16P30+50DF
Daikin Altherma 3 R ECH₂O
4P663482-1A – 2021.11
2
3
1
1×
2
Connect the shut-off valves using the flat gaskets (accessory bag) to the space
heating/cooling water pipes of the indoor unit.
3
Connect the space heating/cooling field piping to the shut-off valves using a
sealing.
Do NOT exceed the maximum tightening torque (Thread size 1", 25-30 N•m). To
avoid damage, apply the necessary countertorque with a suitable tool.
2
≤Ø7 mm
1
3
4
Connect the domestic hot water in and out pipes to the indoor unit.
Do NOT exceed the maximum tightening torque (Thread size 1", 25-30 N•m). To
avoid damage, apply the necessary countertorque with a suitable tool.
1
2
5
Cut open the top cover.
If the space heating/cooling or the domestic hot water pipes are directed upwards,
the top cover must be cut along the perforation with a suitable tool.
Содержание Altherma 3 R ECH2O
Страница 313: ......
Страница 314: ......
Страница 315: ......
Страница 316: ...4P663482 1A 2021 11 Copyright 2021 Daikin Verantwortung für Energie und Umwelt ...