
6
|
Application guidelines
Installer reference guide
56
ERLA11~W1 + EBSH/X(B)11+16P30+50DF
Daikin Altherma 3 R ECH₂O
4P663482-1A – 2021.11
6.4.4 DHW pump for instant hot water
Setup
b
c
d
a
a
Cold water IN
b
Hot water OUT (shower (field supply))
c
DHW pump (field supply)
d
Recirculation connection (optional)
▪
By connecting a DHW pump, instant hot water can be available at the tap.
▪
The DHW pump and the installation are field supply and the responsibility of the
installer. For the electrical wiring, see
"9.3.7 To connect the domestic hot water
▪
For installation instructions of the optional recirculation connection, see the
installation manual of the recirculation kit (141554).
Configuration
▪
For more information, see
▪
You can program a schedule to control the DHW pump via the user interface. For
more information, see the user reference guide.
6.4.5 DHW pump for disinfection
Setup
b
c
d
e
a
A
a
Cold water IN
b
Hot water OUT (shower (field supply))
c
DHW pump (field supply)
d
Heater element (field supply)
e
Non‑return valve (field supply)
▪
The DHW pump is field-supplied and its installation is the responsibility of the
installer. For the electrical wiring, see
Содержание Altherma 3 R ECH2O
Страница 313: ......
Страница 314: ......
Страница 315: ......
Страница 316: ...4P663482 1A 2021 11 Copyright 2021 Daikin Verantwortung für Energie und Umwelt ...