
16
|
Disposal
Installer reference guide
282
ERLA11~W1 + EBSH/X(B)11+16P30+50DF
Daikin Altherma 3 R ECH₂O
4P663482-1A – 2021.11
16.2 To drain the storage tank
DANGER: RISK OF BURNING/SCALDING
The water in the storage tank and all the connected piping can be very hot.
16.2.1 To drain the storage tank without a connected pressureless solar system
To prepare draining when no optional fill and drain kit is available
1
Open the screw plug of the spillover connection.
2
Unplug the spillover connector.
a
2
1
a
b
3
a
Spillover connector
b
Screw plug
3
Connect the loose end of the spillover drain hose to an appropriate drain.
To prepare draining when an optional fill and drain kit is available
1
Remove the connection cover from the screw plugs on the front.
2
Open the screw plug of the upper connection on the front.
a
b
2
1
a
Connection cover
b
Screw plug
3
Insert the screw plug into the fill and drain kit and secure with the clip
contained in the option kit.
Содержание Altherma 3 R ECH2O
Страница 313: ......
Страница 314: ......
Страница 315: ......
Страница 316: ...4P663482 1A 2021 11 Copyright 2021 Daikin Verantwortung für Energie und Umwelt ...