
9
|
Electrical installation
Installer reference guide
143
ERLA11~W1 + EBSH/X(B)11+16P30+50DF
Daikin Altherma 3 R ECH₂O
4P663482-1A – 2021.11
A
A
B
B
5 6
X 2M
1
N/- L/+
Space C/H
On/OFF output
Max. load
0,3 A - 230 V AC
1 A - 5 V DC
5
6
3
Fix the cable with cable ties to the cable tie mountings. General information,
see
"9.3.1 To connect the electrical wiring to the indoor unit"
130].
9.3.10 To connect the changeover to external heat source
Wires: 2×0.75 mm²
Maximum load: 0.3 A, 230 V AC
Maximum load: 1 A, 5 V DC
[9.C]
Bivalent
1
Open the following (see
"7.2.4 To open the indoor unit"
1
User interface panel
1
3
4
2
2
Switch box
3
Switch box cover
4
Top cover
2
Connect the changeover to external heat source cable to the appropriate
terminals as shown in the illustration below.
Содержание Altherma 3 R ECH2O
Страница 313: ......
Страница 314: ......
Страница 315: ......
Страница 316: ...4P663482 1A 2021 11 Copyright 2021 Daikin Verantwortung für Energie und Umwelt ...