DAIHAN-Sci.com or
ALL forLAB.com
Shopping Mall
DAIHAN Scientific, Rotary Vacuum Evaporator
10/31
(7) Connect the Capillary valve with tube and the joint unit of condenser valve. At this time, make the
tube reach to the neck of Evaporating Flask.
(8) Connect GL18 screw cap to washing hole on the top of Condenser.
(9) Connect GL14 screw cap to Temp.sensor hole.
(10) Connect Vacuum nozzle cap to Vacuum hole on
Temp.sensor hole
(11) Connect Coolant nozzle cap on the two holes on Vacuum hole.
(12) Put GL10 open top screw cap and Viton O-ring
in Capillary feed tube. Joint them with Feeding port.
(13) Put Condenser support bar in the position
shown in the figure. Fix M5 set screw.
(14) Put together Condenser holder
with support bar. Fix M4 set screw.
(15) Place the Heating Bath controller with
power cable in the right side of the main body.
Position Bath over Bath controller.
Joint M5 set screw.
(13)
(15)
Joint M4 set screw.
(14)
※
16 page “condenser
See the name of each part.
(11)
(10)
(9)
(8)
(12)