E1-XL/B-IP Multiplexor
© 2006 Cronyx
11
Section 2. Installation
2.1. Requirements to Equipment Installation Location
When installing multiplexor leave not less than 10 cm of free space behind it for con-
nection of interface cables. Ambient temperature should be 0 to +50 °С with humidity
80%, non-condensing.
2.2. Supply Set
E1-XL/B-IP system unit ................................................................................1
External power supply unit with mains cord ..................................................1
Counter part of E1 interface DB-15 connector ...............................................1.
Loopback for E1 interface testing...................................................................1
Installation and Operating Manual .................................................................1
Содержание E1-XL/B-IP
Страница 48: ...Web www cronyx ru E mail info cronyx ru ...