![Crestron UPX-2 Скачать руководство пользователя страница 19](http://html.mh-extra.com/html/crestron/upx-2/upx-2_operation-manual_2683681019.webp)
Universal Presentation Processor
Crestron
UPX-2
Troubleshooting the Demo Program
If the DTT-15V2/DTT-17 is displaying “Communications Error with Control
System”, check the following possibilities.
•
The control system has the wrong CUZ file version (3.137 or greater is
required).
•
The UPX-2 Cresnet ID must be set to 03 for the demo program to function.
In Crestron Toolbox, open the address book, connect to the control system,
and select
Tools | Network Device Tree
for a network device report.
Change the NET ID to 03 if necessary.
•
Verify that the demo program for the DTT-15V2 or DTT-17 is running on
the 2-Series control system.
•
If communicating to the UPX-2 via Ethernet, the control system’s IP
address must be in the UPX-2s IP table. Refer to “TCP/IP Communication”
on page 64 for information on IP tables.
Button Configuration
When the system is initially started after loading the demo project, the five source
selection buttons are not assigned.
Place and hold a finger on the Crestron logo at the bottom left corner of the screen
for approximately five seconds.
Pressing the Crestron Logo on the Demo Program
A new page will appear that allows you to select each button, assign an icon, and
assign an input. Click the
Return
button to go back to the demo program.
Operations Guide – DOC. 6276B
Universal Presentation Processor: UPX-2
¥
xvii