D I A M A N T
Pro
17
Original instructions.
INSTALLATION AND START UP
Machine positioning
MIN. 10 cm
MIN. 30 cm
Install within 0-3º horizontal.
1.
Installing the machine in the service area must be performed by a qualified person. As the machine
may be quite heavy, at least two strong, capable individuals are recommend to work together to
lift and position the machine. Consult the Technical Specifications page for the specific machine
model being installed for machine weight and dimensions details. Contact a service technician to
do this task if you are not confident about performing the steps below.
2.
Position the machine on a level, sturdy, and water-resistant surface approximately 110cm above
floor level for ease of access and usage.
3.
Adjust the feet to ensure that it dispenses coffee evenly to all cups.
4.
Ensure enough free space is available above (>30cm) and behind (>10cm) the machine to ensure
easy cleaning and maintenance and adequate ventilation.
Important:
Leave an air gap of at least 30cm above the machine and 10cm behind it to ensure adequate
ventilation. The machine must be installed within 3º of horizontally level front-to-back and side-
to-side to ensure proper hydraulic function and drainage. Confirm with a spirit level or digital
angle gauge.
Do not install the machine if the machine or installation surface it is wet. Allow it to dry
completely and ask a service technician to ensure that none of the electrical components have
been affected.