Chapter
4.
Water Supply
This chapter explains water supply requirements for equipment, in particular water-cooled
cabinets. It includes the following topics:
•
•
•
•
Chilled Water Requirements, on page 4-2
Water-Cooled Cabinet Chilled Water Supply Requirements, on page 4-3
Preparing the Cooling Unit for the Connection of Water-Cooled Cabinets, on page 4-4
Cooling Unit Fixtures for Water-Cooled Cabinets, on page 4-4
mportant The water supply installation should be performed by an air-conditioning
specialist/plumber.