
PN 12071 R122210
19
19
ASSEMBLY
4.8 REEL BAT ARM INSTALLATION
1. Slide the reel bat arm assemblies over the manifold
assembly. Position each assembly onto the pinion
gears and the idler gears of the manifold assembly
(Figure 15).
2. Align the reel bat arm assemblies so that all of the arms
are in line with one another.
The outside face of the arms of the reel bat arm assem-
blies must face away from the pillowblock.
WARNING
Figure 16: Idler gear installation (front side)
PILLOWBLOCK
BEARING
PINON GEAR
IDLER GEAR
OUTSIDE FACE
OF ARM
REEL BAT
ARM ASSEMBLY
THIS SIDE OF REEL ARM
MUST FACE AWAY FROM
PILLOWBLOCK BEARING
BACK SIDE
OF MANIFOLD
4.9 IDLER GEAR INSTALLATION (FRONT)
1. Assemble one idler gear assembly each to the RH &
LH end clamps, and to all idler mount clamps (front side
of manifold only), using one 3/8” X 2” bolt, three 3/8”
flat washers and one 3/8” center locknut per each idler
gear assembly (Figure 16).
2. Use a small pry bar between the outside wall of the
manifold tubing and the idler gears with approx. 5 lbs.
of force (Figure 17)
Figure 17: Tighten center locknuts
3/8" CENTER
LOCKNUT
WASHER
3/8" FLAT
WASHER
3/8" FLAT
IDLER GEAR
ASSEMBLY
BOLT
3/8" X 2"
BACK SIDE
OF MANIFOLD
3. Tighten the 3/8” center locknuts to 30 ft-lbs.
4. Check the alignment of the reel bat arm assembly with
the pinion and idler gears by looking from the front and
rear of the manifold.
5. Rotate the reel arm assemblies to ensure they turn
freely.
Figure 15: Reel bat arm installation
Содержание Air Reel
Страница 14: ...PN 12071 R122210 10 ...
Страница 56: ......
Страница 57: ......
Страница 58: ......
Страница 59: ......