![CoolBot Walk-in Cooler Скачать руководство пользователя страница 6](http://html.mh-extra.com/html/coolbot/walk-in-cooler/walk-in-cooler_construction-manual_2660815006.webp)
PHONE: 888-871-5723
2018 © Store It Cold, LLC.
Rev 2018-9a
All Rights Reserved.
ENCLOSURE INSTALLATION INTRUCTIONS
Enclosed with the Installation manual there is a Set-up drawing, showing the identification
and proper placement of your walk-in cooler panels.
IMPORTANT
YOUR WALK-IN COOLER PANELS, DOOR, SCREEDING OR OUTDOOR PACKAGE PARTS MIGHT
DIFFER IN DESIGN OR LOOKS FROM THE ONES SHOWN IN THIS MANUAL.
Having a SUCCESSFUL INSTALLATION begins with having a level floor. If the floor is not level,
it will be necessary to install shims, under each floor panel cam-lock.
If the Walk-in does not have Floor Panels, then install shims under the Walk-in's Vinyl screed.
A minimum of 2" clearance between existing building walls and Walk-in is necessary for
proper air circulation
.