![CoolBot Walk-in Cooler Скачать руководство пользователя страница 12](http://html.mh-extra.com/html/coolbot/walk-in-cooler/walk-in-cooler_construction-manual_2660815012.webp)
PHONE: 888-871-5723
2018 © Store It Cold, LLC.
Rev 2018-9a
All Rights Reserved.
9.
Close the wall enclosure by installing the last wall panel and give a last check around
your box to make sure all surfaces are flush and the top edges of the walls are all level.
10.
Select the first ceiling panel from your Set-up drawing and place it on the corresponding
side of the cooler indicated in the drawing. Ensure that it sits properly on all the tongue
and groove edges and that it is flush with the corners and walls on the outside.