![CoolBot Walk-in Cooler Скачать руководство пользователя страница 14](http://html.mh-extra.com/html/coolbot/walk-in-cooler/walk-in-cooler_construction-manual_2660815014.webp)
PHONE: 888-871-5723
2018 © Store It Cold, LLC.
Rev 2018-9a
All Rights Reserved.
13.
Install the last ceiling panel to close the box.
14.
IMPORTANT!!
Check your box around one last time. Seams in between panels should be tight and
flush.
Check your door for correct operation
. Open your door less than 90° and let it
close by itself. Make sure it closes freely and makes a good seal with the frame. Ensure
the door does not hit or rub against any parts of the frame.
A door that is not closing
properly is usually the result of unlevel set-up and/or improper installation
. Please
unlock the necessary panels and correct positioning and leveling until the door operates
properly.