Continuum Surelite Laser
18
996-0207
Figure 5 Cooling group chassis assembly for SL I-20 Hz.
Supplies
You will need the following to install the Surelite:
•
Plug to fit your lab’s 200-240 V~ socket
•
Distilled water, 1.5 gallons (6 liters), 1
Μ
/cm resistivity or better
(water from a glass distiller will meet this requirement)
•
50 ml of methanol, reagent grade or better (for cleaning optics)
•
Lens tissue
•
Laser safety glasses for the fundamental infrared and its harmonics
•
Power meter with volume absorbing detector
R
EQUIRED
T
OOLS
•
metric Allen keys: 1.5, 2, 2.5, 3, 4 & 5 mm (provided with laser)
•
adjustable 6" wrench
•
Phillips screwdriver
•
standard screwdriver
•
flashlight
•
inspection mirror
•
small ruler (~15 cm or 6")
•
3/32 Allen k
Содержание Surelite EX 10
Страница 8: ...Continuum Surelite Laser 6 996 0207 This page is intentionally blank...
Страница 12: ...Continuum Surelite Laser 2 996 0207 This page is intentionally blank...
Страница 26: ...Continuum Surelite Laser 16 996 0207...
Страница 36: ...Continuum Surelite Laser 26 996 0207 This page is intentionally blank...
Страница 57: ...Section 3 System Operation 996 0207 47 Figure 27 Surelite chronograph...
Страница 74: ...Continuum Surelite Laser 64 996 0207 Figure 45 Cooling group chassis assembly for Surelite I 20 Hz...
Страница 80: ...Continuum Surelite Laser 70 996 0207 This page is intentionally blank...
Страница 92: ...Continuum Surelite Laser 82 996 0207...
Страница 94: ...Continuum Surelite Laser 84 996 0207 This page is intentionally blank...
Страница 106: ...Continuum Surelite Laser 96 996 0207 This page is intentionally blank...
Страница 107: ...Appendix B Operator Notes...
Страница 108: ...Continuum Surelite Laser 98 996 0207...
Страница 109: ...Appendix B Operator Notes 996 0207 99...
Страница 110: ...Continuum Surelite Laser 100 996 0207...
Страница 111: ...Appendix B Operator Notes 996 0207 101...
Страница 112: ...Continuum Surelite Laser 102 996 0207 This page is intentionally blank...