
21
Starting from 6 modules, the bottom rail is supplied in 2
parts. The supplied ground rail coupling aid (2) is used for
proper alignment.
After proper alignment and fixing of the rails, the coupling
aid is removed.
6�4 Transport
The carrying aids (1) can be attached to both modules at
different positions (2) in order to transport them. Make sure
that the spring catches fit correctly.
width of min. 160 mm so that the insulation, which touches
the ground next to the rail, is flush. Preferably apply the
layer as thin as possible.
NOTE:
Alternatively compensate only area under rails with
levelling compound and joint (such as with silicone) the
gaps between the floor and the insulation after mounting
the insulation.
The correct distance between the rails is achieved with
2 stencils (1). Transfer the positions of the drill holes for the
fixing screws to the flour and drill. Screw the bottom rails
and control the evenness.
NOTE:
The two rails must be absolutely parallel side to side
and level in height!
Remove the stencils (1).
T D M A - VA R I C A L :
Assembly instructions